Contract: Cottingham Power Station Main Contractor: Clough Smith Job Specification: To drill and install 6 No. 355 ducts and 1 No.
180 duct under rail tracks. The 6 No, 355 ducts must be at 2
metre centers with the 180 in the middle at 1 metre centre. Drill Length: 60 metres. Machine Used: Vermeer D24/40 - Installs pipe up to 355mm
diameter.